Maximum Demand for Buildings
Estimating maximum demand is a topic frequently discussed. Working out how much power to allow for a building can be very subjective . Allowing too much...
Railway Electrification Voltages
This post is quick introduction and overview to different railway electrification voltages used in answer to a question sent in via email. While there...
ABB Technical Guides - Motor Operation
ABB has produced a range of technical guides that offer concise explanations of the major technologies and technical issues in low voltage AC drives. ...
Lead us, Warleader
Delum, who had watched all in silence, his face empty of expression, now spoke in turn. ' "Lead us, Warleader, into glory."'
Reading is something I do...
Fault Calculation - Per Unit System
Per unit fault calculations is a method whereby system impedances and quantities are normalised across different voltage levels to a common base. By removing...
IEC 61439 - The Switchgear Standard
The new standard IEC 61439 replaces the old 60439. Compared to the old standard, the new 61439 is a more clearly defined and takes into account the assembly...
Hazardous Areas – IEC and NEC/CEC Comparison
Depending where in the world you work, you are likely following one of two standards
International Electrotechnical Commission (IEC)
National...
Fire Resistant and Fire Retardant Cables
Fire resistant and fire retardant cable sheaths are design to resist combustion and limit the propagation of flames. Low smokes cables have a sheath designed...
Standard Cable & Wire Sizes
IEC 60228 is the International Electrotechnical Commission's international standard on conductors of insulated cables. Among other things, it defines a...
Medium Voltage Switchgear Room Design Guide
Many medium voltage (MV) indoor switchgear rooms exist worldwide. The complexity of these rooms varies considerably depending on location, function and...